Laserfiche WebLink
14 <br /> B, Quarterly Ground Samples. <br /> 1 . These results of the groundwater sample taken <br /> the week of July 11 , 1988 were sent from Hargis <br /> + Associates, Inc. on September 30, 1988. <br /> 2. The samples scheduled for October were taken <br /> the week of September 26, 1988 in conjunction <br /> with CME conducted by RWQCB and DHS. <br /> C. Quarterly Lysimeter Samples. <br /> The quarterly samples were taken September 28, <br /> 1988. <br /> D. Phase IV Groundwater Assessment. <br /> Field work on Phase IV started on September 6, 1988 <br /> with the continuous cored hole near California <br /> Water Service well #20. Three wells, shallow, <br /> intermediate and deep, have been drilled at this <br /> location and work is proceeding at other locations. <br /> Please advise if you have any questions. <br /> Sincerely, <br /> THE MARLEY COOLING TOWER CO. <br /> David W. Bates <br /> Chief Production Engineer <br /> DWB/jel <br /> cc' s: Charles White-DOHS Val Siebal-DOHS <br /> Ronald Valinoti -SJEHD Gary Reents-CRWQCB <br /> Jeff Zelikson-USEPA Tim Verhagen-TMC <br /> Terry Hart-MCTC Tom Hickey-Black & Veatch <br /> Hal Daley-Stockton File <br /> Karl Lytz-Latham & Watkins <br />