My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. WQCB Comments: <br /> Note: The following WQCB comments have been excerpted from <br /> Attachment A to DIIS letter of April 29, 1988. Only those <br /> comments which have not been addressed in DHS comments have been <br /> repeated. <br /> WQCB Comment: <br /> 3. I [G.A. Reents of WQCB) still have the same concern <br /> regarding separation of proposed monitoring well screen <br /> intervals discussed in our 25 November 1987 comments. 1t is <br /> important to sample separate aquifer zones to obtain the <br /> most meaningful results. Also, as discussed in our 25 <br /> November, 1987 comments, not installing a shallow zone well <br /> in the initial cluster leaves a data gap. I will agree, <br /> however, that the necessity of a shallow zone well can be <br /> decided after the initial data has been collected. <br /> MCTC Response: <br /> As discussed in response to DHS comments, MCTC will comply with <br /> these suggestions. <br /> WQCB Comment: <br /> 4. It is assumed , since it is not stated , that all wells will <br /> be developed by air stripping as in the past. <br /> MCTC Response: <br /> Work Plan will be revised to note development by air lifting. <br /> WQCB Comment: <br /> 6. Storm water samples need to be collected as composites or <br /> series grabs as discussed in our 2 October 1987 comments. <br /> MCTC Response: <br /> The referenced comments were not incorporated in the sampling <br /> completed. Grab samples only were obtained. <br /> 11654 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.