Laserfiche WebLink
S ECOR <br /> Ms. Victoria McCartney <br /> June 24, 2003 <br /> Page 3 <br /> Groundwater Sampling and Analysis <br /> Following development, groundwater samples will .be collected from each well. Selected <br /> groundwater samples will be submitted to a California State Certified Laboratory, and analyzed for <br /> the presence of TPHg, TPHd, TPHmo, BTEX, MtBE,TBA, DIPE, EtBE, TAME, 1,2-DCA, and EDB. <br /> SCHEDULE <br /> SECOR is prepared to initiate fieldwork within 1 to 3 weeks following the approval of this work plan <br /> by SJCEHD. A report documenting the installation of these wells will be submitted approximately 8 <br /> to 10 weeks after the completion of field activities and receipt of analytical reports. <br /> Should you have any questions or concerns regarding this work plan, please call David Evans of <br /> SECOR at (916) 861-0400, extension 234 or Robert J. Cochran of Chevron at(925) 842-9655. <br /> Sincerely, <br /> SECOR International IncorporatedG�O. <br /> (( n `�� �✓SC <br /> ` OTT OCA <br /> / r. <br /> GAE3LE 04 <br /> Karam Parmar Ott . Gable, R.G No.636, ' <br /> Staff Engineer Senior Geologist Exp- <br /> (0) <br /> xp.® <br /> Enclosures: <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Attachment 1 San Joaquin County Environmental Health Department Correspondence <br /> Attachment 2 Field and Laboratory Procedures <br /> cc: Mr. Robert J. Cochran, Chevron Environmental Management Company, San Ramon, CA <br /> Mr. Jim Barton, Regional Water Quality Control Board, Sacramento, CA <br /> Greyhound Bus Lines, Dallas, TX <br /> lAChevron\90557\REP0RTS\WP for Monitoring Well Installation-2003.REVBr.doc SECOR International Incorporated <br />