My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:09 PM
Creation date
2/22/2019 2:36:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,.Chevron Products Company Page 2 <br /> Chevron Service Station#9-0557,139 S, Center Street,Stockton,California January 4,2002 <br /> (15) feet of screened casing from approximately 17 feet bgs to 32 feet bgs, as was proposed for <br /> MW-13. SECOR will not collect soil samples from the borehole for chemical analysis. Other <br /> well completion details for MW-7R will be as proposed for MW-13 in the Work Plan. <br /> If there are any questions regarding this addendum, please call us at (916) 861-0400 or call Mr. <br /> Bob Cochran of Chevron at (925) 842-9655. <br /> Sincerely, <br /> SECOR International Incorporated <br /> William E. Brasher, P.E. <br /> Project Manager <br /> Attachments: Figure 1 —Site Plan <br /> Figure 2—Dual Completion Ozone Sparge Point Detail <br /> f <br /> cc: Bob Cochran, Chevron Products Company, San Ramon <br /> Marty Hartzell, Regional Water Quality Control Board, Sacramento <br /> C <br /> r <br /> i <br /> t� <br /> I <br /> k <br /> I:\Chevron\90557\REPORTS\Feasibility Study\CAPWPAddendum2.doc <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.