Laserfiche WebLink
,.Chevron Products Company Page 2 <br /> Chevron Service Station#9-0557,139 S, Center Street,Stockton,California January 4,2002 <br /> (15) feet of screened casing from approximately 17 feet bgs to 32 feet bgs, as was proposed for <br /> MW-13. SECOR will not collect soil samples from the borehole for chemical analysis. Other <br /> well completion details for MW-7R will be as proposed for MW-13 in the Work Plan. <br /> If there are any questions regarding this addendum, please call us at (916) 861-0400 or call Mr. <br /> Bob Cochran of Chevron at (925) 842-9655. <br /> Sincerely, <br /> SECOR International Incorporated <br /> William E. Brasher, P.E. <br /> Project Manager <br /> Attachments: Figure 1 —Site Plan <br /> Figure 2—Dual Completion Ozone Sparge Point Detail <br /> f <br /> cc: Bob Cochran, Chevron Products Company, San Ramon <br /> Marty Hartzell, Regional Water Quality Control Board, Sacramento <br /> C <br /> r <br /> i <br /> t� <br /> I <br /> k <br /> I:\Chevron\90557\REPORTS\Feasibility Study\CAPWPAddendum2.doc <br /> f <br />