Laserfiche WebLink
LE j COR <br /> ternational Incorporated <br /> JAN 0 7 2002 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> January 4, 2002 <br /> Project 077.43445.331 <br /> Rebecca Setliff <br /> San Joaquin County Environmental Health Division <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> Re: Addendum No. 2 to Work Plan for Feasibility Testing/ <br /> Corrective Action Plan Preparation <br /> Chevron Service Station#9-0557 <br /> 139 South Center Street <br /> Stockton, California <br /> Dear Ms. Setliff: <br /> SECOR International Incorporated (SECOR), on behalf of Chevron Products Company <br /> (Chevron), presents this second addendum to the Work Plan For Feasibility Testing/Corrective <br /> Action Plan Preparation (the Work Plan), dated June 1, 2001. This addendum to the Work Plan <br /> has been prepared at the request of the San Joaquin County Environmental Health Division <br /> (SJCEHD) in response to our telephone conversation on December 27, 2001. This addendum <br /> addresses SECOR's verbal request, during an earlier telephone conversation, to drill out and <br /> modify existing monitoring well MW-7, as opposed to installing a new monitoring well (MW- <br /> 13) adjacent to it as proposed in the Work Plan (Figure 1). Also, as requested by SJCEHD, <br /> SECOR has provided a detail (Figure 2) of the dual completion ozone sparge points, which were <br /> proposed in the first addendum to the Work Plan, dated November 28, 2001. <br /> As discussed in our telephone conversations, SECOR has requested SJCEHD's approval to drill <br /> out monitoring well MW-7 and re-install the well with a shallower screen interval, instead of <br /> installing the proposed well, MW-13. SECOR has had difficulty procuring a new encroachment <br /> permit from the California Department of Transportation (CalTrans) for work in their right-of- <br /> way to install MW-13. Since Chevron has a valid encroachment permit with CalTrans for MW- <br /> 7, which includes access to perform any necessary modifications to the well, Chevron has <br /> directed SECOR to modify the well. The modified well will be named MW-7R. The borehole <br /> for MW-7 will be overdrilled using minimum 10-inch diameter augers to its total depth and the <br /> existing 2-inch diameter casing will be removed. A new 4-inch diameter casing will replace the <br /> existing 2-inch diameter casing. ,The total depth of MW-7 is approximately 52 feet below ground <br /> surface (bgs). SECOR will install grout from the bottom of the borehole to the proposed depth of <br /> the modified well, approximately 32 feet bgs. The modified well will be completed with fifteen <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 916.861.0400 916.861.0430 Fax www.secor.com <br />