Laserfiche WebLink
Items 1 & 2 have been resolved : Labs now have <br /> corrected improper procedures and get <br /> consistent , correct readings . The stabili- <br /> zation compound has been changed to eliminate <br /> the odor . The schedule is still a concern but <br /> all is being done , that can be done , to com- <br /> plete closure as soon as possible . <br /> Agreement has also been reached on a pre- <br /> meability test method that is satisfactory <br /> too all parties . <br /> C. RI/FS. <br /> Volumes II and III of the RI/FS were mailed <br /> to Department of Health Services and <br /> California Regional Water Quality Control <br /> Board on September 22, 1989. <br /> D. Stormwater Run-Off. <br /> Plan is now being written to sample the <br /> stormwater run-off during the first rainfall . <br /> Please advise if you have any questions . <br /> Sincerely , <br /> THE MARLEY COOLING TOWER CO. <br /> David W. Bates <br /> Chief Production Engineer <br /> Attachment <br /> DWB/.jel <br /> cc' s : Charles White-DHSal Siebal -DHS <br /> Ronald Valinoti-SJEHD Gary Reents-CRWQCB <br /> Jeff Zelikson-USEPA Tim Verhagen-TMC <br /> Hal Daley-Stockton Tom Hickey-Black & Veatch <br /> Karl Lytz- File <br /> Latham & Watkins <br />