My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:41:52 PM
Creation date
2/22/2019 2:39:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SER CES <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> <ROBERT COCHRAN <br /> CHEVRON PRODUCTS COMPANY . <br /> P O BOX 6004 <br /> SAN RAMON CA 94583-0904 <br /> RE: Chevron Service Station 9-00557 <br /> 139 South Center Street <br /> Stockton,CA 95202 <br /> WORKPLAN: Addendum No. 2 to Work Plan for Feasibilijy Testing/Corrective Action Plan Preparation <br /> DATED: 1/4/02 <br /> 'PREPARED BY: SECOR Corporation <br /> APPROVED X <br /> DISAPPROVED ❑ <br /> ADDENDUM ❑ Submit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN (H&S 25299.37,subd.(c)(3).): <br /> 1. . Advance four soil borings to approximately 45 feet below ground surface(bgs)and install dual completion <br /> ozone sparge points in each of the boreholes(for a total of eight sparge points). The sparge points will be <br /> completed to 30 and 45 feet bgs in each borehole. Perform the Ozone Sparge pilot test for a minimum of <br /> three months. <br /> 2. Analyze groundwater samples taken from wells in the treatment area for TPHg,TPHd,TPHmo,BTEX, <br /> and fuel oxygenates. <br /> 3. Submit a report of findings for the Ozone Sparging Test in the Corrective Action Plan(CAP),along <br /> with the results of the other feasibility tests and monitoring well installations. <br /> C01%1MENTS AND CONDITIONS: <br /> 1. After discussion with Regional Board on 1/11/02,PHS/EHD and the Regional Board concluded that it is <br /> important to leave MW-7 screened at the depth it is at presently(32-52 feet bgs). Continue with your <br /> effort in procuring an encroachment permit for the installation of MW-13 from Cal Trans. <br /> 2. Obtain a well permit from PHS/EHD and notify PHS/EHD at least 48 hours prior to the proposed <br /> scheduled work dates. <br /> DATED A) BY ` <br /> cc: CVRWQCB-Marty Hartzell <br /> SECOR Corporation _ <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.