My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:06:16 PM
Creation date
2/22/2019 2:41:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1991
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W�C(11RNIA-HEALTH AND WELFA RE AGE NCY PETE WILSON Governor <br /> DEPARTMENT OF HEALTH SERVICES <br /> OFFICE OF DRINKING WATER <br /> 6455 JACKSON ROAD,SUITE 120 <br /> SACRAMENTO,CA 95826 <br /> (916)739-4034 <br /> April 9, 1991 <br /> Thomas A Hickey, Project Engineer <br /> Black & Veatch, Consulting Engineers <br /> Post Office Box 8405 <br /> Kansas City, Missouri 64114 <br /> Subject: Marley Cooling Tower - <br /> Remedial Ground Water Treatment <br /> The plans and specifications, for the Marley Cooling Tower <br /> Company, to pipe contaminated ground water to a treatment <br /> system for removal of the contaminants, have arrived and <br /> have been thoroughly reviewed. <br /> It was difficult to determine from the plans if adequate <br /> separation is being provided. Parallel separation from the <br /> existing water mains needs to be at least 4 feet edge to <br /> edge. Vertical separation at perpendicular crossings needs <br /> to have 1 foot vertical separation edge to edge with the <br /> water main being above the industrial main. <br /> When the water main crosses beneath the industrial main <br /> mitigating measures must be taken. The use of schedule 80 <br /> plastic pipe is acceptable as one of those measures. <br /> Please include the required separations on the plans as well <br /> as in the specifications. <br /> i <br /> Homer R Vaughn, P. . <br /> Lead Engineer <br /> Stockton District <br /> Office of Drinking Water <br /> cc: Environmental Health Division, San Joaquin Public Health <br /> Services <br /> Mike Camy, California Water Service <br /> HRV/hv <br /> ['.159\S US N..I ev9l l lP <br /> P <br />
The URL can be used to link to this page
Your browser does not support the video tag.