FIELD DOCUMENTS AND WORK PLANS 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:06:16 PM
Creation date
2/22/2019 2:41:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1991
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t • • <br /> Attachment 1 <br /> Schedule of Soil Flushing Activities <br /> This memorandum describes the current schedule of activities associated with the soil <br /> flushing program at the Marley Cooling Tower Company(MCTC)facility in Stockton, <br /> California. The full scale soil flushing program is scheduled to begin on or before <br /> April 20, 1992. <br /> During the middle of September, 1991, we anticipate completing a final suite of <br /> neutron probe measurements and then immediately commence confirmation drilling. <br /> Confirmation drilling will be used to collect soil physical data, including moisture <br /> contents, to determine the actual extent of lateral saturation and to use in the <br /> correlation of neutron probe counts with moisture content. Four deep borings (80 <br /> feet) will be drilled, one each adjacent to MT-1,2,3, and 4, and three optional shallow <br /> borings (45 feet) will be field located to provide greater definition of moisture <br /> contents in the upper clay units. <br /> Following drilling and laboratory analyses of the soil samples, the neutron probe <br /> consultant will create calibration curves and submit his final report. Subsequently, <br /> the pilot study data and a final evaluation report will be submitted to the regulatory <br /> agencies. The final report will also include recommended modifications to the full <br /> scale design, if appropriate. A 30 day period of regulatory review will follow. If <br /> necessary,additional modifications will be made to accommodate regulatory concerns. <br /> Construction of the full scale system will begin in mid-February, 1992 and will take <br /> 6-8 weeks to complete. As mentioned previously, operation of the full scale soil <br /> flushing system will commence on April 20, 1992. See Table 1 for a complete <br /> schedule of activities. <br />