Laserfiche WebLink
• <br /> TABLE 3. MCTC WATER TREATMENT PLANT <br /> EXPANSION SCHEDULE <br /> DATE EVENT <br /> September— Fabrication of treatment plant <br /> October, 1991 expansion equipment. <br /> October 14 — Construction of equipment <br /> November 4, 1991 foundations and sitework. <br /> November 4 — 27, 1991 Installation of treatment <br /> equipment and modifications <br /> to existing equipment. <br /> December 2, 1991 Construction inspection. <br /> December 4 — 11, 1991 Full—scale startup of <br /> treatment system. <br /> MCTC WATER TREATMENT PLANT EXPANSION <br /> B&V Project N 11654.653 <br /> CAW25G:W TSCHE0.WK1 <br /> 08/26/91 <br />