Laserfiche WebLink
Attachment 3 <br /> Schedule for Water Treatment Plant Expansion <br /> This memorandum describes the current schedule for the water treatment plant <br /> expansion at the Marley Cooling Tower Company (MCTC) in Stockton, California. <br /> Design of the water treatment plant expansion is substantially complete. <br /> Procurement documents for purchase and fabrication of treatment equipment have <br /> been submitted to the manufacturers. Equipment is scheduled to arrive onsite no <br /> later than November 4, 1991. Construction drawings for site work and equipment <br /> installation are under going final review by MCTC. The ground water collection <br /> system contractor will be installing the water treatment equipment. Construction of <br /> equipment foundations, sitework, and installation of ancillary equipment will <br /> commence in mid-October. Installation of treatment equipment and modifications <br /> to the existing facility will occur during November 1991. Inspection is tentatively <br /> scheduled for December 2, 1991,with startup immediately following. See Table 3 for <br /> a complete schedule of activities. <br />