Laserfiche WebLink
o <br /> t • , <br /> 3. Groundwater . <br /> The pipe line from the off site wells is near— <br /> ing completion . Connection to the on—site <br /> wells and the on—site pipe line is now under <br /> construction . Electrical power and control <br /> systems are being installed . <br /> The details of the change to the Andco Plant <br /> are being finalized along with additional con— <br /> trol and automation features that will be <br /> added . <br /> C . NPDES Permit <br /> Letter has been sent to the Water Quality Control <br /> Board with the proposed new permit requirements <br /> and the increase in the discharge rate to cover <br /> the Andco Plant expansion . <br /> Please advise if you have any questions . <br /> Sincerely . <br /> THE MARLEY COOLING TOWER CO. <br /> �- Lo . �J,9� <br /> David W. Bates <br /> Chief Production Engineer <br /> DB/jel <br /> cc' s : William Ryan—DHS ,.i' 1 Siebal —DHS <br /> Ronald Valinoti—SJEHD = Camilla Williams—CRWQCB <br /> Jeff Zelikson—USEPA Tim Verhagen—TMC <br /> Howard Rinne—Stockton Tom Hickey—Black & Veatch <br /> Karl Lytz— File <br /> Latham & Watkins <br />