My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:06:16 PM
Creation date
2/22/2019 2:41:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1991
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 <br /> June 7. 1991 <br /> s fi� .1P <br /> Mr . Jim Aus ng <br /> Dep rtmen of ealth Services JUN 10 1991 <br /> Toxic S stance Control Division ENVIRONMENTAL HEALTH <br /> 1015 r0vd0n Wa <br /> Sacramento , California 95827 PERMIT/SERVICES <br /> RE: Progress Report for April and May , 1991 • <br /> Dear Mr . Austreng : <br /> The following is a report of the activities at the <br /> Stockton site for April and May . 1991 . <br /> A. Groundwater Monitoring. <br /> The Quarterly Report has been delayed because of <br /> sampling and procedure error . The wells were <br /> re—sampled in May and report should be available <br /> in the near future . <br /> The report of the lysimeter samples taken April <br /> 9, 1991 are attached . <br /> B. Remedial Activities . <br /> 1 . Surface Soils/Pipes and Culverts . <br /> This phase is complete . Black & Veatch is <br /> preparing final report . This should be <br /> available by July 1 , 1991 - <br /> 2. Subsurface Soils . <br /> The pilot injection well (IW-1 ) and monitoring <br /> tubes are installed . Water injection into the <br /> well was started on May 9, 1991 . There is now <br /> evidence that water is mounding under IW-1 - <br /> Neutron probe measurements for soil moisture <br /> were scheduled for the week of June 3, 1991 . <br /> It now appears the well is working as antici— <br /> pated and pilot test will continue as <br /> scheduled . <br /> MARL£Y <br /> the 6 <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.