Laserfiche WebLink
3. Groundwater . <br /> The early problems with stormwater treatment <br /> with the Andco System are being addressed and <br /> necessary changes are to be in place by the <br /> next winter . The system seems to be operating <br /> with a minimum of problems when treating <br /> groundwater . <br /> The contract for the Groundwater Collective <br /> System has been let to Crutchfield Construction <br /> Company . Preconstruction meetings have been <br /> held and construction is scheduled to begin the <br /> week of June 24, 1991 . <br /> Please advise if you have any questions . <br /> Sincerely , <br /> THE MARLEY COOLING TOWER CO. <br /> C_ , 9 L . �, <br /> David W. Bates <br /> Chief Production Engineer <br /> DB/jel <br /> Attachment <br /> cc' s : William Ryan—DHS `-Val Siebal —DHS <br /> Ronald Valinoti—SJEHD be Camilla Williams—CRWQCB <br /> Jeff Zelikson—USEPA Tim Verhagen—TMC <br /> Howard Rinne—Stockton Tom Hickey—Black & Veatch <br /> Karl Lytz— File <br /> Latham & Watkins <br /> r <br />