My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 <br /> n <br /> � . <br /> AUG 1 1 iAtl� <br /> August 5 . 1.9y2 <br /> ENVIR9NMENTAL HEAIJO <br /> PERW/SENVIgro <br /> IV Duncan Au n <br /> Dep rtment f To, <br /> ' c Substan s control <br /> Acco ntin Unit <br /> P. O. Bo 806 <br /> Sacramento , California 95812-0806 <br /> RE: Progress Report For lune and July , 1992 <br /> Dear Mr . Austin: <br /> The following is a report for the activities related to the <br /> Stockton site for June and July , 1992 . <br /> A. Groundwater Monitoring <br /> The sampling for the April quarter was done the <br /> week of April 27 . 1992 . The Quarterly Report should <br /> be released the week of August 10 , 1992 . The <br /> results of that analyses of the lvsimeter samples <br /> are attached . <br /> The sampling for the July quarter was done the week <br /> of July 20 , 1992 . <br /> B . Remedial Action <br /> 1 . Subsurface Soils <br /> The Flushing System has been operational since <br /> June 8 , 1992 . <br /> 2 . Groundwater <br /> MARLEY <br /> the — <br /> COOLING TOWER <br /> ,I company <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.