Laserfiche WebLink
Che Andco service nw n was tit the site the fast <br /> two week of July to make final adiustments and <br /> corrections , It is now anticipated that full <br /> effort can be given to the plant operation and <br /> increased out-put of treated water with ntinitnal <br /> dorm time for plant modifications . <br /> The April PMP Keport ( Phase 11 ) cs utcludea with <br /> the April Quarterly Report . It is now planned <br /> to do Phase 111 with the October quarterly , <br /> This will allow approximately 3 months of <br /> maximum effort before_ the next evaluation of the <br /> system. <br /> C . NPDES Fermit <br /> The draft is being rer•tewea ana reicrttten. <br /> Sincerely , <br /> THE :NIARLEY COOLING TOWER CO. <br /> David Lt'. bates <br /> Chiet Production Ettgineer <br /> DB/ fel <br /> Attachments <br /> cc ' s : William Rvan- DTSC Siebal-DTSC <br /> Ronald L'a[ inoti-SJEHLrloi;'i Condon-CRNDCB <br /> _Jeff Zelikson-LISEPA Tim L1erhage.n-TA1C <br /> Howard Rinne-Stockton Tont Hickev-black & Veatch <br /> Fite <br />