Laserfiche WebLink
6. WELLS, MONITORING TUBES, AND LYSIMETERS <br /> Page 2A-1 Paragraph 2A-1 , General . Revise the first <br /> M2 <br /> of the second paragraph to read as follows: <br /> "The Work to be performed under this Agreement involves the <br /> installation of 3 injection wells, 3 monitoring tubes, 5 <br /> lysimeter clusters (with two lysimeters per cluster) , and 4 <br /> extraction/monitoring wells. " <br /> Paoes 2A-12 through 2A-14 Estimated Quantities and Estimated <br /> Depths. Replace Tables 2A-1 and 2A-2 with the revised tables <br /> attached. <br /> 7. SECTION 11A - HORIZONTAL END SUCTION CENTRIFUGAL PUMPS <br /> Replace entire section with Section 11A attached. <br /> 8. SECTION 11B - SUBMERSIBLE PUMPS <br /> Page 11B-2 Paragraph 11B-4 Performance and Design <br /> Requirements. <br /> Replace entire paragraph with Paragraph 11B-4 attached. <br /> 9. SECTION 15C - MISCELLANEOUS VALVES <br /> Replace entire section with Section 15C attached. <br /> C. DRAWINGS <br /> 1. Replace Drawings G-1 through G-4 (Dated 11/25/91) <br /> with Drawings G-1 through G-4 (Dated 1/17/92) . <br /> AD1-2 <br />