My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID FORM <br /> CONTRACT NO. 13 - FULL-SCALE SOIL FLUSHING SYSTEM <br /> To MARLEY COOLING TOWER COMPANY <br /> 5800 FOXRIDGE DRIVE <br /> MISSION, KANSAS 66202 <br /> ATTENTION: MR. DAVID BATES <br /> THE UNDERSIGNED BIDDER, having familiarized himself with the Work required <br /> by the Contract Documents, the site where the Work is to be performed, <br /> local labor conditions, and all laws , regulations, and other factors <br /> affecting performance of the Work, and having satisfied himself of the <br /> expense and difficulties attending performance of the Work, <br /> HEREBY PROPOSES and agrees, if this Bid is accepted, to enter into <br /> Agreement in the form attached to perform all Work, including the <br /> assumption of all obligations, duties, and responsibilities necessary to <br /> the successful completion of the contract and the furnishing of all <br /> materials and equipment required to be incorporated in and form a permanent <br /> part of the Work; tools, equipment, supplies, transportation, facilities , <br /> labor, superintendence, and services required to perform the Work; and <br /> Bonds, insurance and submittals; all as indicated or specified in the <br /> Contract Documents to be performed or furnished by Contractor for the <br /> following lump sum costs: <br /> Division 131 : <br /> The following unit costs shall include all costs for health and safety <br /> monitoring, personal protective equipment, and decontamination of <br /> equipment used during subsurface construction activities. <br /> INJECTION WELLS (Hollow-stem auger or dual-wall reverse circulation <br /> drilling with split barrel sampling every 5 feet to a total depth of <br /> 70 feet; 50 foot screen, filter pack, and all below grade well <br /> construction as shown on Drawing G-3) : <br /> Dollars per INJECTION WELL per IW) . <br /> EXTRACTION WELLS (Hollow-stem auger or dual-wall reverse circulation <br /> drilling with split barrel sampling every 5 feet to a total depth of <br /> 100 feet; 50 foot screen, filter pack, and all below grade well <br /> construction as shown on Drawing G-3) including submersible pumps (at <br /> EW-2 and EW-3) : <br /> Do I I ars per EXTRACTION WELL per EW . <br /> (MARLEY FSSF ) <br /> (CONTRACT NO. 13) BF-1 <br /> (11654.812 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.