My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXTRACTION SYSTEM <br /> Remove 1" pilot system hose between MW-206 and MW-214 and cap <br /> connections (Dwg G-2) . <br /> EW-2 and EW-3 pump pads and guard posts (Dwgs G-2 and G-3) . All <br /> piping and piping components from EW-2 and EW-3 to existing effluent <br /> holding tank (Dwgs G-2, G-3, and G-4) . <br /> MANHOLES <br /> Manholes complete in accordance with Section 2A (as shown on Drawing <br /> G-3) including concrete/asphalt removal and repair at IW-3, IW-4, IW- <br /> 5, EW-4, EW-5, MT-7, MT-8, MT-9, and L-301 through L-310. <br /> CONCRETE/ASPHALT REMOVAL AND REPAIR <br /> All concrete/asphalt removal and repair necessary to install influent <br /> and effluent piping, and to construct pump pads and guard posts. <br /> EFFLUENT TRANSFER SYSTEM <br /> ETP-1 , effluent transfer piping, and appurtenant components between <br /> existing effluent holding tank and connection to 3-inch groundwater <br /> force main adjacent to MW-214. <br /> DIVISION 132 Work to be performed or furnished by Contractor for the <br /> following lump sum cost: <br /> Dollars <br /> DIVISION 133: <br /> Supply and installation of all electrical and control wiring, conduit, <br /> devices, and components to be bid later. <br /> The undersigned Bidder agrees to furnish the required Bonds and to enter <br /> into an Agreement within five days after Owner' s acceptance of this Bid, <br /> and further agrees to substantially complete construction of Division 131 <br /> by March 6, 1992 and Division 132 by March 20, 1992. <br /> The undersigned Bidder hereby certifies (a) that this Bid is genuine an is <br /> not made in the interest of, or in the behalf of, any undisclosed person, <br /> firm, or corporation, and is not submitted in conformity with any agreement <br /> or rules of any group, association, organization, or corporation; and (b) <br /> that he has not sought by collusion to obtain for himself any advantage <br /> over the Owner. <br /> The undersigned Bidder acknowledges receipt of the following Addenda, which <br /> have been considered in preparation of this Bid: <br /> No. Addendum No. i Dated January 17. 1992 <br /> (MARLEY FSSF ) <br /> (CONTRACT NO. 13) BF-3 <br /> (11654.812 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.