My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and EXTRACTION WELLS (as described above) without submersible pumps <br /> (at EW-4 and EW-5): <br /> Dollars per EXTRACTION WELL w o pump per EW . <br /> MONITORING TUBES (Dual-wall reverse circulation drilling with split <br /> barrel sampling every 5 feet to a total depth of 95 feet; 10 foot <br /> screen, filter pack , and all below grade construction as shown on <br /> Drawing G-3) : <br /> Dollars per Monitoring Tube per MT) . <br /> LYSIMETER NESTS (Hollow-stem auger or dual-wall reverse circulation <br /> drilling with split barrel sampling every 5 feet to a total depth of <br /> 52 feet; 2 lysimeters at each nest location, filter pack , and all <br /> below grade construction as shown on Drawing G-3): <br /> Dollars per LYSIMETER NEST per L nest) . <br /> DIVISION 132: <br /> Full-scale system construction costs including personal protective <br /> equipment, the following components (for clarification) , and all other <br /> appurtenant components indicated by the drawings , specifications, and <br /> as outlined in the Project Requirements Section (except the exclusions <br /> identified within Division 133) : <br /> INJECTION WATER SUPPLY <br /> Connection to existing effluent force main (Section A, Dwg G-4) . <br /> IP-1 pump pad and guard posts (Dwgs G-2 and G-3) . <br /> Fluid switch, flow meter, and valves appurtenant to IP-1 installation <br /> (per Spec. 15C) . <br /> Relocate NP-2 for service as IP-1 (per Spec. 11A) . <br /> PVC piping from IP-1 to existing influent holding tank (Dwgs G-2 and <br /> G-4) . <br /> City water connection in wood treatment building and PUC piping to <br /> existing influent holding tank complete (Dwgs G-2 and G-4) . <br /> ISM PVC piping from influent holding tank to IW-1 through IW-5. <br /> ISM valves and flow meters at IW-1 through IW-5 (Spec. 15C) . <br /> ISM PVC piping connection to and modification of pilot ISM, removal <br /> of pilot ISM piping and components, and cap pilot ISM connections <br /> (Dwgs. G-2 and G-4) . <br /> (MARLEY FSSF ) <br /> (CONTRACT NO. 13) BF-2 <br /> (11654.812 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.