My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT <br /> THIS AGREEMENT, made the _ day of 19_, by and between <br /> The Marley Cooling Tower Company, referred to in these Contract Documents <br /> as "Owner" , and <br /> referred to in these Contract Documents as "Contractor" : <br /> WITNESSETH: <br /> THAT WHEREAS: in accordance with law, Owner has caused Contract <br /> Documents to be prepared for and in connection with the construction of a <br /> full-scale soil flushing system at the Marley Cooling Tower Company, <br /> Stockton, California, facility; and <br /> WHEREAS, Contractor, in response to an invitation by the Owner, has <br /> submitted to Owner, in the manner and at the time specified, a Bid in <br /> accordance with Instructions; and <br /> WHEREAS, Owner has opened, examined, and canvassed the Bid submitted, and <br /> has duly awarded to Contractor a contract therefor, for the sum or sums <br /> named in Contractor's Bid. <br /> NOW, THEREFORE, in consideration of the compensation to be paid to <br /> Contractor and of the mutual agreements herein contained, the parties to <br /> these presents have agreed and hereby agree, Owner for itself and its <br /> successors, and Contractor for itself, himself, or themselves, and its, <br /> his, or their successors and assigns, and its, his, or their executors <br /> and administrators, as follows: <br /> ARTICLE I . The Contractor shall perform all Work under Division(s) <br /> and , including the assumption of all obligations, duties and <br /> responsibi7ities necessary to the successful completion of the contract <br /> and the furnishing of all materials and equipment required to be <br /> incorporated in and form a permanent part of the Work; tools, equipment, <br /> supplies, transportation, facilities, labor, superintendence and services <br /> required to perform the Work; and Letter of Credit or Bonds, insurance <br /> and submittals; all as indicated or specified in the Contract Documents <br /> to be performed or furnished by Contractor for the Work included in and <br /> covered by Owner' s official award of this contract to Contractor, such <br /> award being based on the acceptance by Owner of Contractor' s Bid. <br /> (MARLEY FSSF ) <br /> (CONTRACT NO. 13) A-1 <br /> (11654.812 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.