My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111A-1 . GENERAL DESCRIPTION OF WORK. The work to be performed under <br /> these Contract Documents consists of the construction of full-scale soil <br /> flushing system located in the wood treating area of the Marley Cooling <br /> Tower Company' s Stockton, California facility. <br /> The project is divided into three Divisions as follows: <br /> Division 131 - Construction of Wells, Monitoring Tubes, and <br /> Lysimeters. <br /> Division 132 - General Construction. <br /> Division 133 - Electrical . <br /> The Contractor under each Division shall plan, schedule, and coordinate <br /> his operations in a manner which will facilitate the simultaneous <br /> progress of the Work under other Divisions. It is anticipated that <br /> Division 131 must be started prior to the concurrent completion of <br /> construction within Divisions 132 and 133. <br /> Supplementing the requirements of the specifications relative to the <br /> scope of any specified type of construction, the scope of the contracts <br /> shall be as follows: <br /> IA-1 .01 Division 131 - Construction of Wells Monitorino Tubes and <br /> Lvsimeters. Division 131 shall include the following principal items of <br /> Work: <br /> All work in Section 2A pertaining to construction of injection <br /> wells, extraction wells, monitoring tubes, and lysimeter nests. <br /> Work in Section 2D pertaining to decontamination. <br /> 1A-1 .02 Division 132 - General Construction. Division 132 shall include <br /> the following principal items of Work: <br /> Work in Section 2A pertaining to manhole covers. <br /> Work in Section 2B pertaining to below grade injection supply and <br /> extraction force main piping. <br /> Work in Section 2C pertaining to pavement repair. <br /> Work in Section 3A pertaining to concrete for pump pads and guard <br /> posts. <br /> Work in Section 11A pertaining to horizontal end suction centrifugal <br /> pumps. <br /> All work in Sections 15A, 156, and 15C. <br /> (MARLEY FSSF ) <br /> (CONTRACT NO. 13) IA-1 <br /> (11654.812 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.