Laserfiche WebLink
IA-1 .03 Division 133 - Electrical . Division 133 shall include the <br /> following principal items of Work: <br /> All Work in Division 16. Includes all electrical and control <br /> wiring, conduit, and lighting. <br /> All Work in Division 3 pertaining to underground concrete encased <br /> electrical ductbank and electrical handholes. <br /> Furnishing of all anchor bolts, expansion anchors, sleeves, inserts, <br /> hangers, and accessories required for proper installation of all <br /> wiring and equipment to be installed under Division 133, including <br /> those to be installed in the forms before concrete is poured. The <br /> Contractor under Division 133 shall furnish all necessary setting <br /> drawings for such bolts, anchors, sleeves, inserts, hangers and <br /> accessories. <br /> Furnishing of drawings and details for all openings required in <br /> concrete work for proper installation of the Work included under <br /> Division 133. These details shall be furnished directly to the <br /> Contractor under Division 132. The Contractor under Division 133 <br /> shall be responsible for the location, size and adequacy of all such <br /> openings in concrete, or other construction in which they are <br /> installed. The Contractor under Division 132 will provide all forms <br /> for openings in concrete, and shall keep the Contractor under <br /> Division 133 informed as to the times of placing such concrete or <br /> construction masonry by a minimum advance notice of 24 hours. <br /> All grouting as required for equipment and materials furnished and <br /> installed under Division 133. The Contractor under Division 132 <br /> will provide all concrete foundation pads as required to complete <br /> the work included under Division 133. " <br /> (MARLEY FSSF ) <br /> (CONTRACT NO. 13) 1A-2 <br /> (11654.812 ) <br />