Laserfiche WebLink
bearing housing vents and drains; and fittings for properly adding <br /> bearing lubricant. Grease lubricated pumping units shall be provided <br /> with a means of venting the casing. Oil lubricated units shall be <br /> provided with constant level oilers or with sight glasses arranged to <br /> indicate operating the static oil levels. <br /> 11A-7. BALANCE. All rotating parts shall be accurately machined and <br /> shall be in as nearly perfect rotational balance as practicable. <br /> Excessive vibration shall be sufficient cause for rejection of the <br /> equipment. The mass of the unit and its distribution shall be such that <br /> resonance at normal operating speeds is avoided. In any case, the <br /> vibration displacement (peak-to-peak) as measured at any point on the <br /> machine shall not exceed 4.0 mils. <br /> At any operating speed, the ratio of rotation speed to the critical <br /> speed of a unit or components thereof shall be less than 0.8 or more <br /> than 1 .3. <br /> 11A-8. DRIVE UNITS. <br /> 11A-8.01. Electric Motors. The motors shall be totally enclosed, fan <br /> cooled, rated 480 volts, 60 Hz, three phase and shall conform to the <br /> General Equipment Stipulations. The motor shall be furnished with space <br /> heater sized to prevent condensation on the core and windings and <br /> suitable for a 120 volt, 60 Hz, single phase power supply. Space heater <br /> leads shall be brought out through the motor terminal box for wiring in <br /> conduit. <br /> Motor drivers shall be rated to produce the run-out horsepower <br /> requirement without overloading, for the speed and impeller provided. <br /> 11A-9. SHOP TESTS. The pump shall be tested at the factory for <br /> capacity, power requirements, and efficiency at specified rated head, <br /> shutoff head, operating head extremes, and at as many other points as <br /> necessary for accurate performance curve plotting. All tests and test <br /> reports shall be made in conformity with the requirements and <br /> recommendations of the Hydraulic Institute Standards. <br /> 11A-10. INSTALLATION. Each pumping unit shall be leveled, plumbed, <br /> aligned, and wedged into position to fit connecting piping. <br /> Installation procedures shall be as recommended by the pump <br /> manufacturer, the Hydraulic Institute Standards, and as required herein. <br /> Grouting shall be as specified in the grout section. <br /> The pump base shall be grouted after initial fitting and alignment but <br /> before final bolting of connecting piping. Special care shall be taken <br /> to maintain alignment of pumping unit components. No stresses shall be <br /> transmitted to the pump flanges. <br /> (MARLEY FSSF ) <br /> (CONTRACT NO. 13) 11A-5 <br /> (11654.812 ) <br />