My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECD m <br /> JAN 13 1992 <br /> THE MARLEY COOLING TOWER COMPANY ENVIRONMi: <br /> 5800 Foxridge Drive/P.O. Sox 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 <br /> January 3, 1992 <br /> Mr. J 'm Austreng <br /> Depar ment of Health Services <br /> Toxic Subst c s Control Division <br /> 10151 <br /> Croydon W _ <br /> Sacram n o, California 95827 <br /> RE: Progress Report for October and November, 1991. <br /> Dear Mr. Austreng: <br /> The following is a report of the activities at the <br /> Stockton site for October and November, 1991 . <br /> A. GroundWater Monitoring. <br /> Samples were taken for the October Quarterly <br /> the week of October 28, 1991. The lysimeter re- <br /> sults are attached and the Quarterly Report should <br /> be sent from Hargis in the near future. <br /> The next samples round is scheduled for the week <br /> of January 27 , 1992. <br /> B. Remedial Activities. <br /> 1 . Subsurface Soils. I <br /> Bid documents for the Flushing System have <br /> been released. The release calls for con- <br /> struction to start in mid-February and be <br /> complete by April 6, 1992. <br /> 2. Groundwater. <br /> The Groundwater Collection System is complete <br /> and has been through the initial inspection and <br /> minor items are being corrected. The Collect- <br /> ive 'System is complete. The work on the <br /> Treating Plant continues with start-up schedul- <br /> ed for January 13, 1992. <br /> MAR D <br /> the — <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.