My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 2004-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 2004-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 7:04:53 PM
Creation date
2/22/2019 3:01:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 2004-2014
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix C: initial Study Checklist Former Madey Cooling Tower Company,Stockton,CA <br /> b. Result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general <br /> plan, specific plan or other land use plan. <br /> Impact Analysis: No impact is anticipated. <br /> Conclusion: <br /> ❑ Potentially Significant Impact <br /> ❑ Potentially Significant Unless Mitigated <br /> ❑ Less Than Significant Impact <br /> ® No Impact <br /> References Used: <br /> Description of Baseline Environmental Conditions: Typical noise emanates from residences and the high school area. <br /> The Stockton Municipal Code, Chapter 16, Development Code, Section 16-340.030 A, Table 3-7 provides that the Hourly <br /> Equivalent Sound Level from land uses shall not exceed 65 decibels (dB) during daytime or nighttime hours as measured <br /> at the property line of the receiving residential land use.When determining the effectiveness of noise mitigation measures, <br /> the standards shall be applied on the receiving side of noise barriers or other property line noise mitigation measures. <br /> Analysis as to whether or not project activities would: <br /> a. Expose persons to or generate noise levels in excess of standards established in the local general plan or noise <br /> ordinance, or applicable standards of other agencies. <br /> Impact Analysis: Noise levels established for the area by the municipal code shall not be exceeded during the project. <br /> Drilling will create a temporary disturbance to those located around the area. Elevated noise levels are expected <br /> during the process of drilling to the desired first injection depth. Once at the desired injection depth, the drill rigs will <br /> either be tumed off or remain idling to provide auxiliary power for equipment, and the overall noise level will decrease. <br /> Once the desired solution volume is injected, the drill rigs will start drilling to the next injection interval and then either <br /> shut down during additional injection activities or idle to supply auxiliary power. It is anticipated that each rig will be <br /> idling or turned off for approximately 50% of a typical 10 hour drilling work day. Drill rigs will be turned off or idled <br /> whenever possible to reduce overall noise. Drill rigs and other equipment will be aligned whenever possible to reduce <br /> noise to sensitive receptors (residents and school occupants). MWH is evaluating temporary noise barriers or noise <br /> fences to be placed immediately around the work site, when applicable. <br /> Conclusion: <br /> ❑ Potentially Significant impact <br /> ❑ Potentially Significant Unless Mitigated <br /> ® Less Than Significant Impact <br /> ❑ No Impact <br /> b. Exposure of persons to or generation of excessive groundbourne vibration or groundbourne noise levels. <br /> Impact Analysis: Drilling will create temporary groundbourne vibrations as a result of the nature of the drilling method. <br /> Rotary-sonic drilling uses vibration and rotation to advance drill pipe into the subsurface. MWH proposes the use of <br /> potable water to aid in the drilling process and help reduce overall drill rig noise. <br /> Conclusion: <br /> ❑ Potentially Significant Impact <br /> ❑ Potentially Significant Unless Mitigated <br /> ® Less Than Significant Impact <br /> ❑ No Impact <br /> c. A substantial permanent increase in ambient noise levels in the vicinity above levels existing without the project. <br /> Impact Analysis: Once drilling is complete there will be no further noise. There will not be a permanent noise level <br /> increase. <br /> Conclusion: <br /> ❑Potentially Significant impact <br /> Page 18 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.