My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 2004-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 2004-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 7:04:53 PM
Creation date
2/22/2019 3:01:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 2004-2014
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Steven Ross and Brett Stevens November 16,2007 <br /> DTSC/CRWQCB Page 2 <br /> Additionally,MWH proposes to perform a baseline sampling of the wells specified in Section 11. <br /> of the MRP prior to initiating the injection program. The baseline sampling is proposed to <br /> establish current concentrations prior to treatment within the area of in-situ remediation to <br /> monitor remedial performance. As detailed in the MRP the site is divided into two injection <br /> areas, the northern injection area (which includes wells; MW-1, MW-2, MW-7, MW-8, MW- <br /> 101,MW-102,MW-104,MW-105,MW-106,MW-207,MW-208,MW-213,MW-300,MW- <br /> 323, MW-361, and new wells TW-12 and TW-13) and the southern injection area (which <br /> includes wells;MW-9,MW-201,MW-204,MW-205,MW-301,MW-303,MW-304,MW-310, <br /> MW-321,MW-322,MW-324,MW-325,and new wells TW-14,TW-15,TW-16,and TW-17), <br /> separated by the Stockton Terminal and Eastern rail spur (see Figure 1). Baseline sampling is <br /> proposed to be performed prior to the start of injections in each respective area as discussed in <br /> the MRP. <br /> Please do not hesitate to contact me at(916)418-8354 if you have any questions regarding this <br /> matter or the project. <br /> Sincerely, <br /> MWH Americas,Inc. <br /> Tony P. Mikacich <br /> Project Manager <br /> Attachment: Figure 1 -Groundwater Monitoring Well Field <br /> cc: Dan McGrade, SPX Corporation <br /> Steven Stuart, Dudek& Associates, Inc. <br /> Harlin Knoll, SJC-EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.