My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 2004-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 2004-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 7:04:53 PM
Creation date
2/22/2019 3:01:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 2004-2014
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Siddharth Sewalia and Mr.Martin Hermann <br /> Notification of Adjustment to Full-Scale In Situ Treatment Performance Sampling of the North Yard <br /> Former Marley Cooling Tower Site Page 4 June 4,2013 <br /> • MW-401 —Chromium is stable, far below and never exceeded the WQO since I" quarter <br /> 2008. <br /> • TW-12 — Chromium is stable, far below and never exceeded the WQO since 15` quarter <br /> 2008. <br /> • TW-13 — Chromium is stable and far below the WQO since 3`d quarter 2010, with one <br /> exceedence in 4`h quarter 2012. <br /> If another round of in situ remediation injections is to occur, the full list and analytical suite of <br /> sampling will be performed as outlined in MRP Section lI. <br /> Upcoming Sampling Event(July 2013) <br /> SPX is currently making arrangements for groundwater sampling in July, to cover the site-wide <br /> groundwater monitoring program and the performance monitoring program. SPX respectfully <br /> requests a response from RWQCB and DTSC staff regarding the changes outlined by <br /> June 17, 2013, so the sampling list can be finalized for the July sampling event. <br /> Plans for Future Remedial Injections <br /> SPX continues to evaluate groundwater data and is developing a plan for additional Intermediate <br /> Zone groundwater in situ treatment. Draft work plan(s) will be submitted for additional drilling <br /> and testing in the near future. <br /> References <br /> MWH Americas,Inc. (MWH), 2007. Final Remedial Action Plan Amendment. June. <br /> Sincerely, <br /> MWH Americas,Inc. <br /> 00 <br /> Eric Rowney, PE, PMP <br /> Project Manager <br /> Attachments: <br /> Figure 1. In Situ Reactive Barrier Locations and Horizontal Wells in Retort Pit Area <br /> Table 1. Laboratory Analytical Results <br /> cc: Dan McGrade, SPX Corporation <br /> Jim Lingo, SPX Cooling Technologies <br /> Steven Stuart,Dudek <br /> Amy Wilson,TRC <br /> Harlin Knoll, SJC-EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.