My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012560
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
ARCHIVED REPORTS XR0012560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:35:54 PM
Creation date
2/22/2019 3:13:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012560
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MIA i <br /> �•.�w say <br /> 3 <br /> GROUNDWATER TECHNOLOGY <br /> ` STANDARD OPERATING PROCEDURE. <br /> CONCERNING SOIL SAMPLING KMODOLOGY <br /> SOP 24 <br /> Soil samples should be collected and preserved in <br /> accordance with Groundwater Technology Laboratory's <br /> Standard Operating Procedure (GTL SOP 15) eoncatming <br /> a Soil Sample Collection and Handling when Sampling for <br /> Volatile Organics. A hollow stem soil auger should be <br /> used to drill to the desired sampling depth. A standard <br /> 2 inch diameter split spoon sampler 15 inches in length <br /> shall be used to collect the samples. The samples are <br /> contained in 2 inch diameter by 6 inch long thin bralled <br /> brass tube liners fitted into the split spoon sampler <br /> (three per sampler) . <br /> The split spoon sampler should be driven the full depth <br /> of the spoon into the soil using a 140 pound hammer. <br /> The spoon shall then be extracted from the borehole and <br /> the brass tube liners containing the soil sample removed <br /> from the sampler. The ends of the liner tubes should be <br /> immediately covered with aluminum foil, sealed with a <br /> teflon or plastic cap, and then taped with duct tape. <br /> After being properly identified with sample data entered <br /> on a standard chain of custody form the samples shall be <br /> placed on dry ice (maintained below 4'C) and transported <br /> to the laboratory within 24 hours. <br /> One of the three soil samples retreived av each sample <br /> depth shall be analyzed in the field using a photoioni- <br /> zatir�n detector and/or explosimeter. The purpose of the <br /> field analysis is to provide a means to choose samples <br /> to be laboratory analyzed for hydrocarbon concentrations <br /> and to Qnable comparisions between the field and <br /> laboratory analyses, The soil sample shall be sealed in <br /> a plastic bag and placed in the sun to accelerate the <br /> vaporization of volatile hydrocarbons from the soil. one <br /> of the two field vapor instruments shall be used to <br /> µ quantify the amount of hydrocarbon released to the air <br /> from the soils. The data shall be recorded on the drill <br /> logs at the depth corresporuing to the sample point. <br /> Gata"snu%TER <br /> `" TEcH%0L 1G5.I%c <br />
The URL can be used to link to this page
Your browser does not support the video tag.