Laserfiche WebLink
page 2, 205 Center Street <br /> quarterly groundwater monitoring and sampling imm diately. If further construction activity is <br /> planned for the site, acknowledgement that the cont actors performing the work have been <br /> made aware of the existence and locations of thew IIs must be made to PHS/EHD prior to <br /> the start of work, and the wells must be protected frc m any.further damage. If the wells <br /> cannot be adequately protected during construction 3ctivities they must be properly <br /> destroyed per San Joaquin County Well Standards before construction begins, and then <br /> reinstalled after the construction is complete. <br /> If you have any questions or comments please call Lori Duncan at (209)468-0337. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Lori Duncan, Senior REHS Dot Lofstrom, R.G. <br /> LOP/Site Mitigation Unit IV Engineering Geologist <br /> cc: Marty Hartzell, CVRWQCB <br /> Rusty Benkosky, SECOR <br /> Bill Brown, Daley & Heft <br />