My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
3500 - Local Oversight Program
>
PR0544173
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 2:04:59 PM
Creation date
2/25/2019 10:25:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544173
PE
3528
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'* Less than <br /> Potentially--)Significant Less-than- <br /> Significant w/Mitigation Significant No <br /> Impact Incorporated Impact Im act <br /> d. Substantially increase hazards because of a design ❑ ❑ ❑ <br /> feature (e.g., sharp curves or dangerous intersections <br /> or incompatible uses (e.g., farm equipment)? <br /> e. Result in inadequate emergency access? ❑ ❑ ❑ <br /> f. Result in inadequate parking capacity? ❑ ® ❑ ❑ <br /> g. Conflict with adopted policies, plans, or programs ❑ ❑ ® ❑ <br /> supporting alternative transportation (e.g., bus turnouts, <br /> bicycle racks)? <br /> Supporting Documentation/References Cited: Refer to IS29-96, Section 4.13 <br /> 16. UTILITIES AND SERVICE SYSTEMS-Would the project: <br /> a. Exceed wastewater treatment requirements of the appli- ❑ ❑ ❑ <br /> cable Regional Water Quality Control Board? <br /> b. Require or result in the construction of new water or ❑ ❑ ❑ <br /> wastewater treatment facilities or expansion of existing <br /> facilities, the construction of which could cause signifi- <br /> cant environmental effects? <br /> c. Require or result in the construction of new stormwater ❑ ❑ ❑ <br /> drainage facilities or expansion of existing facilities,'the <br /> construction of which could cause significant environ- <br /> mental effects? <br /> d. Have sufficient water supplies available to serve the ❑ ❑ ❑ <br /> project from existing entitlements and resources, or <br /> would new or expanded entitlements be needed? <br /> e. Result in a determination by the wastewater treatment ❑ ❑ ❑ <br /> Provider that serves or may serve the project that it has <br /> adequate capacity to serve the project's projected <br /> demand in addition to the provider's existing commit- <br /> ments? <br /> f. Be served by a landfill with sufficient permitted capacity to ❑ ❑ ❑ <br /> accommodate the project's solid waste disposal needs? <br /> g. Comply with federal, state, and local statutes and regulations ❑ ❑ ❑ <br /> related to solid waste? <br /> Supporting Documentation/References Cited: <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.