My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
3500 - Local Oversight Program
>
PR0544173
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 2:04:59 PM
Creation date
2/25/2019 10:25:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544173
PE
3528
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEALTH SE VICES <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D. M.P.H., Health Of ficer ' <br /> 304 East Weber Avenue, Third Floor • Stockton, CA 95202 tlFo�� <br /> 209/468-3420 <br /> PAUL SUPPLE KITTY WALKER <br /> ARCO PRODUCTS COMPANY COS REDEVELOPMENT AGENCY ' <br /> P O BOX 6549 305 N EL DORADO STREET <br /> MORAGA CA 94570 STOCKTON CA 95202 <br /> RE: Arco Station#4493 Site Code: # 1042 <br /> 205 Center Street <br /> Stockton CA 05202 <br /> WORKPLAN. Addendum to Work Plan dated November 16,2a 0 <br /> DATED: December 20,2000 <br /> PREPARED BY: SE COR International Incorporated <br /> APPROVED: x <br /> D. EDED: Submit bDISAPPROVE <br /> ar <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN ADDENDUM <br /> 1. The San Joaquin County Well Standard will be adhered to when onstructing the multi completion wells. The wells <br /> will be installed with 8 inch hollow stem augers to allow for installation of a minimum 2 inch diameter grout seal. <br /> 2. Lateral assessment of the down-gradient extent of the contaminai it plume in groundwater was not addressed at this <br /> time due to construction activities in the immediate area. <br /> 3. The shallowest sampling port in each multi-completion well will be at 30 feet bsg. <br /> COMMENTS AND CONDITIONS: <br /> 1. See 12/05/00 PHS/EHD correspondence for approved elemerim of the 11/16/00 work plan. <br /> 2. Forty eight hours notice to PHS/EHD is required prior to initia g field work- <br /> DATED <br /> orkDATED t l Z 1101 BY �- <br /> on'Duncan,Senior REHS 209 468-0337 <br /> CC: M-v HartzelL CVRWQC B <br /> Bill Brown,Daley&Heft FIL; F. <br /> RustyBenkosky,SECDft °`"� CO3j) <br />' 3 <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.