My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
205
>
3500 - Local Oversight Program
>
PR0544173
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 2:04:59 PM
Creation date
2/25/2019 10:25:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544173
PE
3528
FACILITY_ID
FA0003613
FACILITY_NAME
ARCO STATION #4493*
STREET_NUMBER
205
Direction
N
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13909003
CURRENT_STATUS
02
SITE_LOCATION
205 N CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�.JSPUBLIC HLALTH SERVIC <br /> SAN JOAQUIN COUNTY z` ? <br /> ENVIRONMENTAL HEALTH DIVISI DN T <br /> Karen Furst, M.D., M.P.H., Health Officer <br /> 304 East Weber Avenue, Third Floor • Stockto , <br /> CA 95202 <br /> 209/468-3420 <br /> PAUL SUPPLE <br /> ARCO PRODUCTS COMPANY <br /> P O BOX 6549 <br /> MOR.AGA CA 94570 <br /> RE: Arco Station#4493 SITE CODE: #1042 <br /> 205 Center Street <br /> Stockton CA 95202 <br /> WORK PLAN: Work Plan for the Installation of Multi Completio Wells <br /> DATED: November 16,2000 <br /> PREPARED BY: SECOR International Incorporated <br /> APPROVED: <br /> I D: <br /> ADDE NQ UM EDED: x Submit bac December 29,200 <br /> ADE DATE AND NEC ES SARY ELEMENTS OF THE WORK PLAN[H&S 25299.37,subd(c)(3)]: <br /> 1. One onsite and two offsite continuous core soil borings will be advanced to 60 feet bsg. Multi-completion <br /> monitoring wells will be installed in each boring with sampling ports at 25 feet bsg,45 feet bsg and 60 feet bsg. <br /> 2. Selected soil samples will be analyzed for TPHg(EPA Method 8015m),BTEX(EPA Method 8020) and ether <br /> oxygenates,EDB and 1,2-DCA(EPA Method 8260). <br /> 3. Following development,the wells will be sampled and analyzed for TPHg(EPA Method 8015m),BTEX(EPA <br /> Method 8020),and MtBE,TAME,DIPS,TBA,ELBE, 1,2-DCA and EDB (EPA Method 8260). <br /> 4. San Joaquin County well installation permits"and City of Stockcor encroachment permits will be obtained. <br /> COMMENTS AND CONDITIONS: <br /> 1. The San Joaquin County Well Standards must be adhered to in c nstructing the multi-completion wells. Specifically, <br /> a 2-inch radial diameter annular seal must be in place from ground surface to the top of the most shallow bentonite <br /> transition seal. Include in the addendum written explanation of how the upper annular space of the wells n711 be <br /> completed to comply with the Well Standards. <br /> 2. Lateral assessment of the downgradient extent of the plume was not included in the submitted plan. Explain why,or <br /> include it in the addendum <br /> 3. Current site wells are built to 25 feet bsg. PHS/EHD recomme ds the shallowest sampling port of the multi- <br /> completion <br /> ulticompletion wells be constructed below this,perhaps 30 feet bsg. <br /> DATED 11�00 BY l�ti^�a <br /> Lori Duncan Senior REHS 209 468-0337 <br /> CC: Many Hartzell,CVRWQCB <br /> Kitty Walker,City of Stockton Redevelopment Agency <br /> Bill Brown,Daley&Heft FIL <br /> Rusty Benkosky,SECOR Copy <br /> A Division of San Joaquin County health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.