My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRESNO
>
1404
>
4700 - Waste Tire Program
>
PR0540862
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 10:18:27 AM
Creation date
2/25/2019 10:56:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0540862
PE
4720
FACILITY_ID
FA0009519
FACILITY_NAME
CRM - Crum Rubber Manufacturers
STREET_NUMBER
1404
Direction
S
STREET_NAME
FRESNO
STREET_TYPE
AVE
City
STOCKTON
Zip
95206
APN
16337018
CURRENT_STATUS
02
SITE_LOCATION
1404 S FRESNO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
CField
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSURE PLAN CalRecycle 504(Rev.6/14) <br /> Page 3 of 3 <br /> Closure Cost Estimate Worksheet Con't <br /> "Loading Cost"represents the total cost of loading all loads of tires into vehicles at the closure facility and unloading the vehicles at <br /> the final destination. The Loading Cost shall be computed using the following formula: <br /> Loading Cost($)=MT x LC <br /> Factor"MT"is described above. <br /> Factor"LC"($per load)represents the unit cost to load one vehicle with waste tires at the closing facility,and to unload the same <br /> waste tires at the final destination. This cost includes operational expenses,which covers wages for workers and pro rated <br /> expenses for rental or lease of equipment and machinery. <br /> "Administration Cost"($)represents the total cost of administration activities for the entire closure operation. This cost shall include <br /> the wages for personnel overseeing the cleanup activities and other operating expenses for the entire project. <br /> "Security Cost"($)represents the total cost of security arrangements for the entire closure operation. This is the cost to secure the site <br /> and restrict public access. This cost covers the expenses for the entire cleanup operation and includes installation of a site fence, <br /> installation or repair of lighting,and wages for security guards,etc. <br /> Notes: <br /> I. Total Closure Cost Estimate will vary according to the facility's design and operation as presented in the Operation Plan, <br /> Form CalRecycle 501 (6/14). <br /> 2. All costs will be added and then multiplied by the contingency factor of 1.2 to estimate the"notal Closure Cost for the <br /> cleanup. <br /> 3. Any deviations from the above formula must be explained. <br /> 4. Complete a separate closure cost estimate worksheet if the waste tires are to be transported to more than one point of <br /> destination. <br /> OPERATOR CERTIFICATION: <br /> I certify under penalty of perjury that the information contained in this document and all attachments are true and accurate to the best <br /> of my knowledge and belief. <br /> Facility Operator or Agent Signature: <br /> Typed Name&Title: Dr.Barry Takal lou,Ph.D.,P.E.President&CEO Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.