Laserfiche WebLink
• 0 <br /> A revised cost estimate was prepared and submitted to the DTSC (ENV America, <br /> 2005a) in response to DTSC's third request. This work plan has been prepared in <br /> response to DTSC's first two requests and contains the following sections: <br /> Section 1.0 An overview of the Site, and a discussion of the purpose and <br /> organization of this work plan. <br /> Section 2.0 Background information of the Site, including history, Site setting, <br /> geology and hydrogeology, regional groundwater quality, <br /> constituents of concern in soil and groundwater, and remedial <br /> activities completed to date. <br /> Section 3.0 Work plan to address acenaphthene concentrations in groundwater <br /> in the vicinity of MW-26R. <br /> Section 4.0 Work plan to decommission eight existing monitoring wells. <br /> Section 5.0 Data evaluation and report preparation. <br /> Section 6.0 Anticipated project schedule. <br /> Section 7.0 References. <br /> 2 ENV;Z <br /> A M E R / C A <br /> P:\PG&E\PGE-05-01 Stockton MW26R Iwestigation\MW26 Work Plan\PGE Stockton MW26R WP.doc <br />