My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0506832
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 8:05:30 PM
Creation date
2/25/2019 1:46:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506832
PE
2950
FACILITY_ID
FA0007654
FACILITY_NAME
PG&E - GAS LOAD CENTER
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.0 ANTICIPATED SCHEDULE <br /> After receiving DTSC approval of this work plan, an application for revocable and <br /> encroachment permits will be prepared and submitted to the City of Stockton (City) for <br /> the installation of MW-27 and decommissioning of eight existing groundwater monitoring <br /> wells. The City indicated that it will take 3 to 4 weeks to process the application. <br /> Application for well installation and decommissioning permits will be prepared and <br /> submitted to the San Joaquin County (County) after receiving the encroachment permits <br /> from the City. <br /> The field activities for well installation and well decommissioning can be scheduled in 2 <br /> to 3 weeks after receiving the City encroachment permits, depending on the availability <br /> of the drilling contractor. The field activities are estimated to take about 2 weeks to <br /> complete. <br /> A report will be prepared for submittal to the DTSC within 8 weeks after receiving the <br /> analytical results of the sample collected from MW-27 from the laboratory. <br /> 13 ENV;: <br /> A M E R I C A <br /> P--.\PG&E GE-05-01 Stockton MW26R Invesb9atWMW26War,Fan\PGE Stockton MW26RWP.doc <br />