Laserfiche WebLink
6.0 ANTICIPATED SCHEDULE <br /> After receiving DTSC approval of this work plan, an application for revocable and <br /> encroachment permits will be prepared and submitted to the City of Stockton (City) for <br /> the installation of MW-27 and decommissioning of eight existing groundwater monitoring <br /> wells. The City indicated that it will take 3 to 4 weeks to process the application. <br /> Application for well installation and decommissioning permits will be prepared and <br /> submitted to the San Joaquin County (County) after receiving the encroachment permits <br /> from the City. <br /> The field activities for well installation and well decommissioning can be scheduled in 2 <br /> to 3 weeks after receiving the City encroachment permits, depending on the availability <br /> of the drilling contractor. The field activities are estimated to take about 2 weeks to <br /> complete. <br /> A report will be prepared for submittal to the DTSC within 8 weeks after receiving the <br /> analytical results of the sample collected from MW-27 from the laboratory. <br /> 13 ENV;: <br /> A M E R I C A <br /> P--.\PG&E GE-05-01 Stockton MW26R Invesb9atWMW26War,Fan\PGE Stockton MW26RWP.doc <br />