Laserfiche WebLink
7.0 REFERENCES <br /> CH2M HILL, 2000, Operation and Maintenance Plan, PG&E Stockton, Former <br /> Manufactured Gas Plant Site, August. <br /> CH2M HILL, 1998, Final Remedial Action Plan, PG&E Stockton, Former Manufactured <br /> Gas Plant Site, March. <br /> California Regional Water Quality Control Board — Central Valley Region (CRWQCB), <br /> 2003, A Compilation of Water Quality Goals, August. <br /> Department of Toxic <br /> Sampling for the Pacific Gas s <br /> and Electric S onces Control Dck on)Ma0n0ufac Manufactured Gas Plant�Stockton, <br /> California, December 21. <br /> ENV America Incorporated, 2005a, Cost Estimate for Financial Assurance, Long-term <br /> Operation and Maintenance, Former Manufactured Gas Plant Site, <br /> January 11. Stockton, California, <br /> ENV America Incorporated, 2005b, 2004 Third Quarter Groundwater Monitoring Report, <br /> Former Manufactured Gas Plant Site, Stockton, California, January 28. <br /> Northeast San Joaquin County Groundwater Banking Authority (NSJCGBA), 2002, <br /> System Plan Components Inventory, August. <br /> Northeast San Joaquin County Groundwater Banking Authority (NSJCGBA), 2004, <br /> Eastern San Joaquin Groundwater Basin Groundwater Management Plan, June. <br /> 14 ENV.^; <br /> A M E R I C A <br /> P\PG&E\PGE-05-01 Stockton MW26R lnry Stigalion\MW26 Work Plan\PGE Stockton MW26R WP do. <br />