My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1991-1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1991-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:30:34 PM
Creation date
2/25/2019 2:35:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1991-1992
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Val F. Siebal <br /> -2- <br /> (b) Technical Activities Expected in Current July 15, 1992 <br /> uarter <br /> During the current quarter, Jul <br /> through <br /> Plans to receive approval of the Phase 2 Worrkplanrfo99Area GIEand <br /> conduct the approved field investigation. This work will be <br /> incorporated in the draft RI Report. Work will be conducted on <br /> the risk assessment, and it will be submitted as agreed to b <br /> and DTSC. <br /> Y PG&E <br /> Three rounds of monthly water level measurements will be <br /> conducted, and one ro <br /> be collund of quarterly water quality samples will <br /> ected. quarterly report including the results of March, <br /> April , and May 1992 monitoring will be submitted. <br /> (c) Technical Activities Planned for Next Quarter <br /> During the calendar quarter October through December 1992, we <br /> anticipate that the draft RI Report including Phase 2 results will <br /> be submitted to DTSC. We anticipate receiving and responding to <br /> DTSC comments on this document, and submitting a final RI Report <br /> soon afterwards. Work on the riskassessment and feasibility <br /> study will proceed, and we plan to submit the draft risk <br /> assessment this quarter. <br /> (d) Problems or Anticipated Problems in Complyinq with Order <br /> No problems are anticipated in complying with the requirements of <br /> the order. Regular monthly meetings between PG&E and DTSC staff <br /> have facilitated communications and the progress of project <br /> activities. A revised schedule incorporating Phase 2 work is <br /> currently being developed. <br /> (e) Results of Analyses Tests or Other Data <br /> The results of the RI were reviewed wish DTSC during our April and <br /> May monthly meetings. These results will be included in their <br /> entirety in the RI Report. Monthly water level measurements and <br /> quarterly water quality analyses are currently being compiled, and <br /> appear to be consistent with those from the RI investigation. <br /> Please call me at (415) 973-1116 if you have any questions or require <br /> additional information on any of the reported activities. <br /> Sincerely, <br /> Yvonne J. Meeks, R.G. , C.E.G. <br /> Manufactured Gas Plant Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.