Laserfiche WebLink
Mr. Val F. Siebal <br /> -2- <br /> (b) Technical Activities Expected in Current July 15, 1992 <br /> uarter <br /> During the current quarter, Jul <br /> through <br /> Plans to receive approval of the Phase 2 Worrkplanrfo99Area GIEand <br /> conduct the approved field investigation. This work will be <br /> incorporated in the draft RI Report. Work will be conducted on <br /> the risk assessment, and it will be submitted as agreed to b <br /> and DTSC. <br /> Y PG&E <br /> Three rounds of monthly water level measurements will be <br /> conducted, and one ro <br /> be collund of quarterly water quality samples will <br /> ected. quarterly report including the results of March, <br /> April , and May 1992 monitoring will be submitted. <br /> (c) Technical Activities Planned for Next Quarter <br /> During the calendar quarter October through December 1992, we <br /> anticipate that the draft RI Report including Phase 2 results will <br /> be submitted to DTSC. We anticipate receiving and responding to <br /> DTSC comments on this document, and submitting a final RI Report <br /> soon afterwards. Work on the riskassessment and feasibility <br /> study will proceed, and we plan to submit the draft risk <br /> assessment this quarter. <br /> (d) Problems or Anticipated Problems in Complyinq with Order <br /> No problems are anticipated in complying with the requirements of <br /> the order. Regular monthly meetings between PG&E and DTSC staff <br /> have facilitated communications and the progress of project <br /> activities. A revised schedule incorporating Phase 2 work is <br /> currently being developed. <br /> (e) Results of Analyses Tests or Other Data <br /> The results of the RI were reviewed wish DTSC during our April and <br /> May monthly meetings. These results will be included in their <br /> entirety in the RI Report. Monthly water level measurements and <br /> quarterly water quality analyses are currently being compiled, and <br /> appear to be consistent with those from the RI investigation. <br /> Please call me at (415) 973-1116 if you have any questions or require <br /> additional information on any of the reported activities. <br /> Sincerely, <br /> Yvonne J. Meeks, R.G. , C.E.G. <br /> Manufactured Gas Plant Project <br />