My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:19:06 PM
Creation date
2/25/2019 2:35:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1993-1995
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Electrir, Company Environmental Services r, <br /> PO Box 7640 ; <br /> San Francisco,CA 94120 c�tiL faE Tl1 <br /> 415/973-7000 � ' a✓/( Q( <br /> Direct Dial 415/973- <br /> September 15, 1995 Telecopy 415/973-9201 9 P�/ 18 <br /> James L. Tjosvold, P.E. <br /> Acting Chief, Site Mitigation Branch <br /> California Environmental Protection Agency <br /> Department of Toxic Substances Control <br /> 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> Dear Mr. Tjosvold: <br /> Re: Docket #HSA 90/91-08 - Stockton Former Manufactured Gas Plant Site <br /> Subject: Revised Project Schedule <br /> Attached for your review and approval is a revised project schedule for Pacific Gas and <br /> Electric's (PG&E's) Stockton Former Manufactured Gas Plant Site. This project <br /> schedule supersedes the schedule submitted to you on May 1, 1995, and has been revised <br /> to incorporate the following: <br /> • Inclusion of four additional months of groundwater level measurements prior to <br /> submittal of the Phase IV Groundwater Investigation Work Plan (for the <br /> installation of additional Zone A, B and C monitoring wells). This is needed to <br /> collect Fall/Winter groundwater level measurements prior to locating the new <br /> monitoring wells. <br /> Inclusion of several remedial objectives and goals in the soil operable unit <br /> feasibility study. <br /> These two items are being incorporated into the schedule for the following reasons: <br /> I. Phase IV Work Plan Submittal <br /> PG&E was directed to install additional groundwater monitoring wells in Zones A, B and <br /> C during a February 28, 1995 meeting with the Department of Toxic Substances Control <br /> (DTSC) and the Central Valley Regional Water Quality Control Board (RWQCB). <br /> During an April 24, 1995 conference call between representatives of PG&E and DTSC, it <br /> was agreed that submittal of the Phase IV Work Plan (for installation of the additional <br />
The URL can be used to link to this page
Your browser does not support the video tag.