Laserfiche WebLink
James L. Tjosvold, P.E. <br /> October 13, 1995 <br /> Page 4 <br /> The next quarterly groundwater monitoring will be conducted in December, 1995. <br /> Monthly water level measurements of all the wells will continue through December, 1995. <br /> V. Results of Analyses Tests or Other Data: <br /> Groundwater sampling was conducted in September, 1995 and the analytical results will <br /> be submitted to you by October 31, 1995 in the "Quarterly Monitoring Report, PG&E <br /> Stockton Former MGP Site, Third Quarter, 1995". <br /> If you have any questions or require additional information, please call me at (415) 973- <br /> 6254. <br /> Patricia Sullivan <br /> Project Manager Stockton Manufactured Gas Plant Site <br /> cc: Mr. William H. Crooks, Executive Officer <br /> Attention: Ms. Wendy Cohen <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br /> Mr. Ron Valin hector <br /> Attention s. Linda Turkatte <br /> San Joaquin nct <br /> P.O. Box 2009 <br /> Stockton, CA 95202 <br />