My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:19:06 PM
Creation date
2/25/2019 2:35:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1993-1995
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
James L. Tjosvold, P.E. <br /> February 23, 1995 <br /> Page 4 <br /> In summary, on-site well MW-5 would be deleted from the sampling program. New wells <br /> MW-17 and MW-19 would be monitored quarterly and existing perimeter wells MWAD <br /> and MW-6 would be sampled annually. The proposed revised program is described in <br /> Table 1. <br /> Zone C: <br /> The Workplan specifies that the parameters to be analyzed in Zone C wells will be <br /> analyzed for PNAs quarterly and one time for general minerals. The rationale was to <br /> evaluate concentrations of chemicals previously detected (PNAs) and evaluate general <br /> water quality(general minerals). <br /> PG&E recommends the following revisions to the monitoring program for Zone C wells: <br /> • Reduce the frequency of sampling from quarterly to annually in the Zone C well <br /> installed prior to the Phase III investigation(MW-13). This well has been sampled <br /> five times and annual analysis will be sufficient to monitor temporal changes. <br /> • Add BTEX analysis because of concentrations of benzene detected in MW-14 and <br /> MW-15, upgradient Zone C wells. Add analysis of barium and antimony for the <br /> reasons stated in the Zone A monitoring program. <br /> In summary, existing well MW-13 would be sampled annually and newly installed wells <br /> MW-14, MW-15 and MW-16 would be sampled quarterly. The proposed revised <br /> program is presented in Table 1. <br /> Please review the proposed revisions to the monitoring program for Zone A, Zone B and <br /> Zone C wells. We would like to discuss this proposal with your staff at our February 28, <br /> 1995 meeting and would like approval to implement this proposal prior to March 15, <br /> 1995. If you have any questions or require additional information, please call me at (415) <br /> 973-6254. <br /> 7 <br /> Patricia Sullivan <br /> Stockton Manufactured Gas Plant Site Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.