Laserfiche WebLink
James L. Tjosvold, P.E. <br /> July 12, 1995 <br /> Page 4 <br /> IV. Activities Planned for Next Ouarter: <br /> The draft soil FS is scheduled to be delivered to DTSC and the RWQCB on September <br /> 18, 1995. This soil FS will incorporate the results of the soil investigation conducted June <br /> 28, 1995 through July 5, 1995. <br /> "The Quarterly Monitoring Report, PG&E Stockton Former MGP Site, Second Quarter, <br /> 1995", will be submitted to DTSC and the RWQCB by July 28, 1995. <br /> The next quarterly groundwater monitoring will be conducted in September, 1995. <br /> Monthly water level measurements of all the wells will continue through August, 1995. <br /> V. Results of Analyses Tests or Other Data: <br /> Groundwater sampling was conducted in June, 1995 and the analytical results will be <br /> submitted to you by July 28, 1995 in the"Quarterly Monitoring Report, PG&E Stockton <br /> Former MGP Site, Second Quarter, 1995'. <br /> If you have any questions or require additional information, please call me at (415) 973- <br /> 6p2554.. <br /> Patricia Sullivan <br /> Stockton Manufactured Gas Plant Site Project Manager <br /> cc: Mr. William H. Crooks, Executive Officer <br /> Attention: Ms. Wendy Cohen <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br /> Mr. Ron Valinoti,Director <br /> Attention: Ms. Linda Turkatte <br /> San Joaquin Local Health District <br /> P.O. Box 2009 <br /> Stockton, CA 95202 <br />