My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:19:06 PM
Creation date
2/25/2019 2:35:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1993-1995
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Cas and Electric, Company Environmental Services <br /> PO Box 7640 <br /> San Francisco, CA 94120 <br /> 415/973-7000 <br /> Direct Dial 415/973- <br /> January 31, 1995 Telecopy 415/973-9201 <br /> rn <br /> Mr. Anthony J. Landis, P.E. <br /> Chief, Site Mitigation Branch <br /> California Environmental Protection Agency <br /> 10151 Croydon Way, Suite 3 ='A <br /> Sacramento, CA 95827 �.. <br /> J <br /> Attention: Mr. Fernando Amador <br /> r-nq <br /> o <br /> Dear Mr. Landis: <br /> Re: Docket #HSA 90/91-008 - Stockton Former Manufactured Gas Plant Site <br /> Attached please find two copies of the"Phase III Technical Memorandum, Stockton <br /> Former Manufactured Gas Plant Site, Pacific Gas and Electric Company", dated January <br /> 31, 1995, which was prepared by Pacific Gas and Electric Company's (PG&E's) <br /> consultant, CH2M HILL. This report is being submitted under the above referenced <br /> order. <br /> This Technical Memorandum describes field activities and soil and ground water <br /> monitoring results associated with the installation of six new groundwater monitoring <br /> wells (one in Zone A, two in Zone B and three in Zone C) and the replacement of one <br /> existing well in Zone A at PG&E's Stockton Former Manufactured Gas Plant Site. These <br /> wells were installed in accordance with the"Final Workplan, Phase III Groundwater <br /> Investigation, PG&E Former Manufactured Gas Plant Site, 535 Center Street, Stockton, <br /> California, DHS Order HSA 90/91-008", dated July 20, 1993. The Technical <br /> Memorandum also describes the results of an aquifer pumping test conducted in Zone B <br /> during the Phase III groundwater investigation. <br /> I will be calling your staff and the Central Valley Regional Water Quality Control Board <br /> staff to arrange a meeting to discuss the attached Technical Memorandum and the <br /> Feasibility Study (which is due on or about March 29, 1995). <br /> If you have any comments or questions regarding the attached Technical Memorandum, <br /> please call me at (415) 973-6254. <br /> Patricia Sullivan <br />
The URL can be used to link to this page
Your browser does not support the video tag.