Laserfiche WebLink
James L. Tjosvold, P.E. <br /> December 21, 1994 <br /> Page 2 <br /> During the week of December 5, 1994, a 25-hour aquifer pumping test was conducted on <br /> MW-19 (one of the new B zone wells). Results of this pumping test will be documented <br /> in the technical memorandum (to be submitted on or about February 1, 1995). <br /> II. Schedule Chanees: <br /> On December 6, 1994,PG&E submitted for approval an updated project schedule which <br /> extended certain project activity dates. The December 6th letter detailed the reasons for <br /> requesting an extension to the project schedule. <br /> III. Activities Planned for Next Quarter: <br /> A technical memorandum describing the new groundwater monitoring wells installed <br /> during October and November, 1994; the results of the aquifer pumping test conducted <br /> during the week of December 5, 1994; and analytical results of groundwater monitoring of <br /> existing and new wells, will be submitted to DTSC on or about February 1, 1995. Per the <br /> project schedule, PG&E will schedule a meeting with DTSC to discuss this technical <br /> memorandum and the feasibility study approximately two weeks after submittal of the <br /> technical memorandum(on or about February 15, 1995). <br /> The next quarterly groundwater monitoring will be conducted in February, 1995. <br /> IV. Results of Analyses. Tests or Other Data: <br /> Groundwater sampling was conducted in July, 1994 and the analytical results were <br /> submitted to you on September 13, 1994 in the"Quarterly Monitoring Report, PG&E <br /> Stockton Former MGP Site, First and Third Quarters, 1994). <br /> If you have any questions or require additional information, please call me at (415) 973- <br /> 6254. <br /> Patricia Sullivan <br /> Stockton Manufactured Gas Plant Site Project Manager <br />