My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1993-1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:19:06 PM
Creation date
2/25/2019 2:35:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1993-1995
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
James L. Tjosvold, P.E. <br /> December 21, 1994 <br /> Page 2 <br /> During the week of December 5, 1994, a 25-hour aquifer pumping test was conducted on <br /> MW-19 (one of the new B zone wells). Results of this pumping test will be documented <br /> in the technical memorandum (to be submitted on or about February 1, 1995). <br /> II. Schedule Chanees: <br /> On December 6, 1994,PG&E submitted for approval an updated project schedule which <br /> extended certain project activity dates. The December 6th letter detailed the reasons for <br /> requesting an extension to the project schedule. <br /> III. Activities Planned for Next Quarter: <br /> A technical memorandum describing the new groundwater monitoring wells installed <br /> during October and November, 1994; the results of the aquifer pumping test conducted <br /> during the week of December 5, 1994; and analytical results of groundwater monitoring of <br /> existing and new wells, will be submitted to DTSC on or about February 1, 1995. Per the <br /> project schedule, PG&E will schedule a meeting with DTSC to discuss this technical <br /> memorandum and the feasibility study approximately two weeks after submittal of the <br /> technical memorandum(on or about February 15, 1995). <br /> The next quarterly groundwater monitoring will be conducted in February, 1995. <br /> IV. Results of Analyses. Tests or Other Data: <br /> Groundwater sampling was conducted in July, 1994 and the analytical results were <br /> submitted to you on September 13, 1994 in the"Quarterly Monitoring Report, PG&E <br /> Stockton Former MGP Site, First and Third Quarters, 1994). <br /> If you have any questions or require additional information, please call me at (415) 973- <br /> 6254. <br /> Patricia Sullivan <br /> Stockton Manufactured Gas Plant Site Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.