My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> James L. Tjosvold, P.E. ' <br /> January 24, 1997 <br /> Page 2 <br /> • On August 28, 1996, PG&E, DTSC and the RWQCB met to discuss input parameters to <br /> the VLEACH model;the groundwater mixing cell; preliminary VLEACH model results; <br /> and the application of VLEACH during the FS. In addition, agreement was reached on <br /> the soil data needs for defining Area I source areas. <br /> • On September 12, 1995,PG&E, DTSC and the RWQCB met to discuss technology <br /> screening for soil and groundwater; ARARs; the status of data needs for Areas I and H <br /> soils; and the installation of a Zone B groundwater monitoring well(s) along El Dorado <br /> Street(perimeter of Area II). <br /> • On October 11, 1996, PG&E, DTSC and the RWQCB met to discuss the results of <br /> sensitivity analysis performed on VLEACH input parameters; the details of the <br /> groundwater mixing cell model; and the use of the VLEACH model and mixing cell model <br /> during the FS. There was a general agreement that most of the parameters used in the <br /> VLEACH model are acceptable and that both the typical and "super run" scenarios will be <br /> used in evaluating areas for remediation. <br /> On July 9, 1996, PG&E received a letter from DTSC regarding the proposed FS approach <br /> (presented by PG&E in a June 6, 1996 letter) clarifying that DTSC considers background or <br /> non-detect to be the starting point for evaluating technologies in the FS. The letter also <br /> suggested that more information is needed to define soil source areas. PG&E prepared a <br /> response to this letter, dated August 6, 1996, which included agreement to do more soil <br /> borings in Area I to further define soil source areas. <br /> PG&E submitted its responses to DTSC and RWQCB comments received on the draft Soil <br /> OUFS (draft Soil OUFS submitted to agencies on November 7, 1995 and agency comments <br /> submitted to PG&E in a letter dated December 26, 1995) on August 19, 1996. <br /> PG&E received agency comments (July 9, 1996 letter) on the"Phase IV Groundwater <br /> Investigation Draft Report", which was submitted to the agencies on June 11, 1996. PG&E <br /> submitted a letter addendum to the Phase IV report addressing these agency comments on <br /> August 7, 1996. On September 6, 1996, DTSC and the RWQCB commented on our August <br /> 7, 1996 response. PG&E replied to these comments in a letter dated September 24, 1996. <br /> The results of quarterly groundwater monitoring done in September, 1996 were submitted to <br /> the agencies on October 31, 1996 in the"Quarterly Monitoring Report, PG&E Stockton <br /> Former MGP Site, Third Quarter 1996". <br />
The URL can be used to link to this page
Your browser does not support the video tag.