Laserfiche WebLink
1 • <br /> • <br /> was agreed that the FS will include a discussion of the under <br /> locations <br /> ground s <br /> toewer and water lines <br /> tion on the <br /> ha�h agas holder near B4 was reviewed. Drawings indicate <br /> foundations do not extend more than 3 to 5 feet <br /> below ground surface. <br /> It was agreed that additional borings are not needed in this portion of the site. <br /> 6.0 Schedule <br /> d work is expected to <br /> in in <br /> con ucted until the results of the field mid-November. <br /> investigation e further <br /> VLEACH modeling will be <br /> ar <br /> It was agreed that PG available in January <br /> would provide a revised schedule to DTSC. <br /> 7.0 Wrap Up/Action Items <br /> Agreements and action items are noted in italics in the text above. <br /> 3 <br />