Laserfiche WebLink
Pacific Gas and Electric Company Environmental Services <br /> P.O.Box 7640 <br /> San Francisco,CA 94120 <br /> 415/973-7000 r <br /> Direct Dial 415/973- <br /> October 10, 1996 Telecopy 415/973-9201 <br /> q RM <br /> James L. Tjosvold, P.E. y , <br /> Acting Chief, Site Mitigation BranchiD <br /> California Environmental Protection Agency 5 <br /> Y <br /> r Department of Tonic Substances Control PAr <br /> 10151 Croydon Way, Suite 3pp <br /> Sacramento, CA 95827 <br /> Attention: Mr. Fernando Amador <br /> Dear Mr. Tjosvold: <br /> Re: Docket No. HSA 90/91-08 - Stockton Former Manufactured Gas Plant Site <br /> Subject: Submittal of Workplan for Additional Soil and Groundwater <br /> Investigation During Feasibility Study <br /> Enclosed for your approval is Pacific Gas and Electric Company's (PG&E's) "Draft <br /> Workplan, Additional Soil and Groundwater Investigation During Feasibility Study, <br /> Stockton Former Manufactured Gas Plant Site". This Workplan is for the installation of <br /> additional soil borings in Areas I and II and a new B Zone groundwater monitoring well <br /> along the perimeter of Area II at PG&E's Stockton site. This additional work was <br /> agreed upon during meetings on August 8, 1996, August 28, 1996 and September 12, <br /> 1996 between PG&E, the Department of Toxic Substances Control and the California <br /> Regional Water Quality Control Board and during a site walk conducted on September <br /> 23, 1996. <br /> If you have any questions or require additional information, please call me at (415) 973- <br /> 6254. <br /> Sincerely, <br /> Patricia Sullivan <br />