Laserfiche WebLink
James L. Tjosvold, P.E. <br /> May 11, 1998 <br /> Page 2 <br /> The results of the fourth quarterly sampling conducted in December 1997 were submitted <br /> to DTSC and the RWQCB on January 30, 1998 in the Quarterly Monitoring Report, <br /> PG&E Stockton Former MGP Site, Fourth Quarter, 1997. <br /> II. Activities Performed During Current Ouarter: <br /> DTSC and RWQCB comments were incorporated into the final DRAP which was issued <br /> on December 31, 1997. This DRAP was approved for public review and comment by <br /> DTSC on January 7, 1998. The DRAP was included in a public repository on January 9, <br /> 1998, along with supporting documents, such as the RI, RA and the FS for this site. Also <br /> included in the public repository were the proposed Negative Declaration and its <br /> supporting document,the California Environmental Quality Act(CEQA) Special Initial <br /> Study for this site. <br /> On January 7, 1998, the Fact Sheet was mailed to DTSC's mandatory mailing list and to <br /> residents and businesses within a four block radius of the site. Both English and Spanish <br /> versions of the Fact Sheet were mailed to the residents and businesses within the four block <br /> radius. A public notice was placed in the January 9, 1998 Stockton Record(local <br /> newspaper)to announce the public comment period on the DRAP and on the proposed <br /> Negative Declaration and to announce the public meeting. <br /> The public comment period on the DRAP and the proposed Negative Declaration began on <br /> January 9, 1998 and ended on February 9, 1998. A public meeting on these documents and <br /> the proposed remedial strategy for this site was held in Stockton on January 20, 1998. <br /> Public comments were received on the DRAP. These comments were discussed in a <br /> February 13, 1998 conference call between PG&E and DTSC; DTSC prepared the <br /> Responsiveness Summary to these comments. This Responsiveness Summary will be <br /> incorporated into the final RAP. On March 18, 1998, DTSC submitted its comments on <br /> the DRAP to PG&E. <br /> The final RAP which incorporates DTSC's March 18, 1998 comments was submitted to <br /> DTSC on March 26, 1998. The final RAP was approved by DTSC in a letter dated April 2, <br /> 1998. A public notice was placed in the April 3, 1998 Stockton Record announcing the <br /> finalization of the RAP and the Negative Declaration for the project. On April 9, 1998, <br /> PG&E issued a complete final RAP (which includes DTSC's final Executive Summary, <br /> DTSC's Responsiveness Summary, and the approved Negative Declaration for this project <br /> and its supporting CEQA Special Initial Study). <br /> Quarterly groundwater monitoring was conducted in March, 1998. The results of this <br /> quarterly monitoring was submitted to DTSC and the RWQCB on April 30, 1998 in the <br /> Quarterly Monitoring Report, PG&E Stockton Former MGP Site, First Quarter, 1998. <br />