Laserfiche WebLink
Figure 3 <br /> For More Areas Proposed for Soil Excavation <br /> Information Church Street <br /> Fernando Amador <br /> Department of Toxic <br /> Substances Control <br /> 10151 Croydon Way, Suite 3 Area <br /> Sacramento, CA 95827 Former MGP <br /> (916) 255-3737 <br /> Sue Sher <br /> Department of Toxic <br /> Substances Control Main Building <br /> 10151 Croydon Way, Suite 3 Source Area 1 <br /> Sacramento, CA 95827 <br /> 191All ?55-?6A7 _ <br /> Ji ronrrer:oae � <br /> w Holder and Former 8 y <br /> Information N Underground feet <br /> Storage Tanks Source Area 3 !q <br /> Repositories E 25 feet w` <br /> Former <br /> ° 8 feet Tar Pit and W <br /> STockton-SanJuaquin v Tar v <br /> County Public Library 7 feet <br /> e feet <br /> 605 North EI Dorado Avenue 28 feet 12 feet <br /> Stockton, California 95202 24 feet <br /> (209) 937-8221 <br />' 23 <br /> State of California Environ- feet <br /> mental Protection Agency Source Area 2 <br /> Department of Toxic Former Gas Holder <br /> Substances Control and Lampblack Pit <br /> 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827 <br /> SE`s oi`rHFa LEGEND Hazelton Avenue A <br /> SOURCE AREA WITH DEPTH OF EXCAVATON <br /> O? <br /> OTHER AREAS NEEDING EXCAVATION WITH <br /> �2�9 i nFOT4 OF <br /> I <br /> 4r/f <br /> Table 1: Anticipated Schedule of Activities <br /> Future Work <br /> After receivingConduct Public Meeting January 20, 1998 <br /> menu, DISC will prepare a Re- January 9,-1998 - <br /> sponsive Summary and approve Hold Public Comment Period <br /> the Final Remedial Action Plan. February 9, 1998 <br /> PG&E will prepare the Gnat reme- Finalize Remedial Action Plan March 4, 1998 <br /> dial design documents for the site. <br /> Cleanup will begin upon approval <br /> of the design documents. A Finalize Design Documents Summer of 1998 <br /> schedule for completing these re- <br /> maining tasks is presented in <br /> Table 1. Implement Cleanup Summer of 1999 <br /> 119716 GH II•PG&E fact sheet newa <br /> 4 <br />