Laserfiche WebLink
SWRCB,January 2002 Page—of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: a Piping Manufacturer El Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 8 Pressure Ll Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: ob fk,-I <br /> - <br /> rdi <br /> Piping Run#e7#11p6j- Piping Run# 7pip ing Run# Piping Run <br /> Piping Material: -*(Z(-:" I <br /> Piping Manufacturer: ASU -,H <br /> Piping Diameter: 3 <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of e5GOT- <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuumAvater and to "11�N <br /> starting test: <br /> Test Start Time: Am <br /> Initial Reading(Rj): Rs I <br /> Test End Time: F f0 - /DAM <br /> Final Reading(RF): 5 <br /> Test Duration: 140- <br /> Change in Reading(RF-Rj): OPS j <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: APass C Fail 0 Pass 0 Fail El Pass El Pass El Fail <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />