My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 1:59:08 PM
Creation date
2/26/2019 11:59:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page—of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: a Piping Manufacturer El Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 8 Pressure Ll Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: ob fk,-I <br /> - <br /> rdi <br /> Piping Run#e7#11p6j- Piping Run# 7pip ing Run# Piping Run <br /> Piping Material: -*(Z(-:" I <br /> Piping Manufacturer: ASU -,H <br /> Piping Diameter: 3 <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of e5GOT- <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuumAvater and to "11�N <br /> starting test: <br /> Test Start Time: Am <br /> Initial Reading(Rj): Rs I <br /> Test End Time: F f0 - /DAM <br /> Final Reading(RF): 5 <br /> Test Duration: 140- <br /> Change in Reading(RF-Rj): OPS j <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: APass C Fail 0 Pass 0 Fail El Pass El Pass El Fail <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.